QUALITY MANAGEMENT • INTERNATIONAL PROJECT SUPPORT

WELL TEST
TRUCK

High-performance oilfield well testing equipment for accurate reservoir evaluation, DST operations, and surface well testing.

See How It Works
+86 189 3767 6920
24/7 Technical Support
info@vancepetro.com
ISO 9001:2015
International project support
Equipment engineering
API Compliant
PRECISION RESERVOIR EVALUATION

About Vance Petro – Your Trusted Well Test Truck Manufacturer

When accurate reservoir data, operational safety, and uptime reliability matter most, oilfield operators around the world turn to the **well test truck** manufactured by **Henan Vance Petroleum Machinery Co., Ltd. (Vance Petro)**.

Our **well testing truck** is a fully integrated **surface well testing unit** that consolidates flow control, pressure monitoring, fluid separation, data acquisition, and safety systems onto a single mobile platform.

International project support
Application engineering
ISO 9001:2015 Quality Management System Certificate – Vance Petro oilfield well testing equipment manufacturer
Documented quality review
Every well test truck is built to the highest quality standards for consistent performance and reliability.
OILFIELD WELL TESTING EQUIPMENT

Well Test Truck – Complete Surface Well Testing Solution

Self-contained, truck-mounted surface well testing unit designed for drill stem testing (DST), production testing, and accurate reservoir evaluation.

High-pressure choke manifold up to 15,000 psi
Advanced data acquisition with real-time monitoring
Integrated test separator and measurement skid
Fail-safe ESD system with remote activation

The Vance Petro **well test truck** is a self-contained, truck-mounted **surface well testing unit** designed to perform the full spectrum of well testing operations in both exploration and production phases.

Every system is purpose-engineered for high-pressure, high-temperature (HPHT) environments and is field-proven across a wide range of geological and climatic conditions.

TECHNICAL SPECIFICATIONS

Well Test Truck – Technical Specifications

Working Pressure5,000 / 10,000 / 15,000 psi (35 / 70 / 103 MPa)
Working Temperature–20°C to +121°C (extended range available)
Flow Rate CapacityUp to 50,000 bbl/day (oil) / 100 MMscf/day (gas)
Choke ManifoldPositive & adjustable chokes, 2-1/16" to 4-1/16" bore
Data AcquisitionReal-time P, T, Q monitoring with digital recording
ESD SystemFail-safe, automatic + manual + remote activation
Hydraulic Power UnitTwin pump, 3,000 psi, 160 L/min
Operator CabinClimate-controlled, ATEX Zone 2 rated
Chassis Options6×4, 6×6, 8×4 configurations
Standards ComplianceAPI 6A, API 16C, ASME B31.3, NACE MR0175

Selection note: confirm the exact model, operating envelope, test conditions and included equipment in the supplier data sheet. Published maxima are not necessarily simultaneous ratings. Certification, delivery, warranty and service commitments must be confirmed for the quoted configuration.

THE PROCESS

How the Well Test Truck Works

Step-by-step well testing process for accurate reservoir evaluation.

1
Mobilization & Rig-Up
Drive to wellsite, position safely, rig up all surface lines and safety systems.
2
Pre-Test Verification
Calibrate sensors, function-test ESD system, and verify all communications.
3
Well Opening & Flow Period
Open well through test tree, control flow through choke manifold, begin data recording.
4
Shut-In & Pressure Build-Up
Shut in well to record pressure build-up for reservoir analysis.
5
Data Analysis & Reporting
Download data, interpret results, and deliver comprehensive well test report.

Applications of the Well Test Truck

Drill Stem Testing (DST)
Evaluate production potential during drilling phase with high-resolution pressure and flow data.
Production Testing
Determine sustained flow rates, water cut, GOR, and productivity index after completion.
Exploration & Appraisal
Comprehensive testing for reserve certification and field development planning.
Reservoir Characterization
Transient pressure analysis to determine permeability, skin, boundaries, and connectivity.
Workover Evaluation
Assess effectiveness of stimulation, re-perforation, or zone isolation treatments.
HPHT & Sour Service
Test high-pressure, high-temperature, and sour wells with NACE-compliant equipment.

Benefits of the Vance Petro Well Test Truck

All-in-One Mobility
Consolidates all well testing functions on a single truck for rapid deployment and minimal logistics.
Superior Data Quality
High-resolution pressure recording (0.01 psi accuracy) with advanced data acquisition system.
Engineered for Safety
Multi-layered ESD system, gas detection, and fail-safe design protect personnel and the well.
Rapid Deployment
Full rig-up in 4–6 hours vs. 12–24 hours for conventional skid-mounted systems.

Why Choose Vance Petro?

Equipment engineering Manufacturing Excellence
Deep expertise in well test equipment design and field performance.
Vertically Integrated Manufacturing
Full control from raw materials to final testing for consistent quality.
Proven in International projects
Field-proven performance across diverse and challenging environments.
Full After-Sales Support
24/7 technical assistance, spare parts, and on-site training.

Well test campaign planning

Define the measurement envelope

Provide expected oil, gas and water rates, wellhead conditions, solids and sour-service requirements. Check the separator and meter operating envelopes across expected test stages.

Review data quality and handover

Agree on calibration records, sampling intervals, stability criteria and the report format. A valid comparison of test results requires consistent operating conditions and documented measurement uncertainty.

Read equipment selection and operating guides

Frequently Asked Questions

What pressure ratings are available?
5,000 psi, 10,000 psi, and 15,000 psi standard. Custom ratings and sour service (NACE MR0175) configurations available.
How fast can you rig up?
Typical rig-up time is 4–6 hours, significantly faster than conventional skid-mounted systems (12–24 hours).
Can it handle both oil and gas wells?
Yes. Our surface well testing unit handles single-phase and multi-phase flow, including high-rate gas wells with ultrasonic metering and hydrate inhibition.
What is the typical lead time?
Standard configurations: 60–90 days. Highly customized units: 90–120 days. We provide detailed production schedules and milestone updates.
READY TO UPGRADE YOUR WELL TESTING OPERATIONS?

Get Your Custom Well Test Truck Quote Today

Response timing confirmed during quotation • Direct Manufacturer Quotation • Full customization available
📞 +86 189 3767 6920
✉️ info@vancepetro.com
🌐 vancepetro.com

Oilfield Well Test Truck Technical Resources

Explore equipment selection, practical operating questions and project delivery requirements.

MeasurementWell Test Truck Meters: Turndown and Low-Rate DataMeasurementWell Test Truck Data: Synchronizing Pressure and RateMeasurementWell Test Backpressure: Effects on Separation and MeteringEquipment planningOilfield Well Test Truck Specifications and Sizing GuideEquipment planningOilfield Well Test Truck RFQ Requirements Checklist

View all 19 technical guides →

Vance Petroleum company and product information